Date | News |
30/03/2006 | Weekly Report-16 is available under documents |
16/03/2006 | Weekly Report-15 is available under documents |
10/03/2006 | First semester demo is available under downloads |
09/03/2006 | Living schedule is updated |
09/03/2006 | Weekly Report-14 is available under documents |
02/03/2006 | Weekly Report-13 is available under documents |
28/02/2006 | Living Schedule is updated |
24/02/2006 | Weekly Report-12 is available under documents |
24/02/2006 | Living Schedule is updated |
16/02/2006 | Web page is up and running |
Orion |
Orion has been founded in 2005 at Middle East Technical University as an engineering company. The vision of the company is being one of the leading technology suppliers in Electrical Design Automation (EDA) and simulation arena by having their own know-how, engineering skills and eco-system. |
Orion: The Name |
Orion, is one of the most dominant constellations, visible in winter in the Northert Hemisphere. In the mythology,
Orion is a hunter, hunting a wild bull (Taurus in the Zodiac), or a lion or a wild camel. The
constellation depicts him as he has kneed in front of Taurus and ready to
hit it with his mace, or club. Orion, also is the name of a nebula within the borders of the constellation. The nebula is placed as the "shining" of Orion's sword. The Nebula is a very rare one that can be seen by naked eyes. Also, the Nebula is known to be a "star factory", a very productive place for cosmos. The selection of this name for our company, thus, is not accidental.Orion company aims to be one of the most productive companies among the other companies investing in EDA field. |
Emin ÖZCAN 05053408421 eminozcan@gmail.com |
|
Mehtap Ayfer PARLAK 05436493383 mehtap.ayfer@gmail.com |
|
Mehmet Ergin SEYFE 05333340290 erginseyfe@gmail.com |
|
Ilgın YARIMAĞAN 05324275106 ilginy@gmail.com |
|
Eren YILMAZ 05354903004 evliya@gmail.com |
Project: Bellatrix | ||||||
The current project of Orion is a Digital Circuit Simulation and Design Tool, known as Bellatrix. Bellatrix has been born as a Senior Project in the Computer Engineering department of Middle East Technical University. Being born in a university, it is specifically designed for students and academics as an easy-to-use and powerful tool for courses such as Logic Design. Technologies making Bellatrix powerful:
| ||||||
Technical Description | ||||||
|
||||||
Bellatrix: The Name | ||||||
Bellatrix, as the name, means "Warrioress". The name is given to one of the stars in the Orion Constellation.
More precisely, Bellatrix is the star representing the Orion's left shoulder.
(see Orion Constellation) Throughout history, this star has been destined to the military success. Though, our work here is not fighting in the battlefield, but competing in the academic arena. Thus, we might think of a "protection" of this star, giving its name to our product. |
Weekly Progress Reports | |
--Second Semester's Reports-- | |
--First Semester's Reports--
|
|
Design Reports | |
Task |
Duration |
Start |
Finish |
Assigned To |
Status |
---|---|---|---|---|---|
Configuration Management Planning |
5 days |
22 February |
26 February |
Mehtap&Ilgýn |
%100 Completed |
Web Page Preparation |
6 days |
12 February |
17 February |
Eren |
%100 Completed |
Other Group's Design Review |
7 days |
20 February |
26 February |
All Members |
%100 Completed |
Design & Demo Review |
6 days |
9 February |
15 February |
All Members |
%100 Completed |
Coding |
75 days |
10 February |
23 April |
All Members |
%10 Completed |
Basic Drawing Operations |
20 days |
10 February |
2 March |
Emin |
%50 Coompleted |
Advanced Drawing Features |
25 days |
3 March |
28 March |
Emin&Eren |
%0 Completed |
Simulation of Combinational Logic |
20 days |
10 February |
2 March |
Ergin |
%35 Completed |
Simulation of Sequential Logic |
15 days |
3 March |
18 March |
Ergin |
%0 Completed |
Time Interval Simulation |
15 days |
19 March |
3 April |
Ergin & Eren & Ilgýn |
%0 Completed |
Connecting JHDL and JGraph libraries |
7 days |
28 March |
3 April |
Emin&Ergin |
%0 Completed |
Implementation of Scripting |
20 days |
10 February |
2 March |
Eren |
%60 Completed |
Implementation of Macro |
15 days |
20 March |
3 April |
Eren |
%0 Completed |
Implementation of User-Defined Components |
7 days |
3 April |
10 April |
Emin& Eren & Ergin |
%0 Completed |
Implementation of Diglog Converter |
20 days |
10 February |
2 March |
Mehtap |
%10 Completed |
Implementation of Save/Load Operations |
20 days |
10 February |
2 March |
Ilgýn |
%10 Completed |
Implementation of Print Operation |
5 days |
20 February |
24 February |
Ilgýn |
%35 Completed |
GUI Design |
30 days |
10 March |
10 April |
Mehtap&Ilgýn |
%30 Completed |
Integration |
14 days |
10 April |
23 April |
All Members |
%0 Completed |
Testing |
55 days |
2 March |
25 April |
All Members |
%0 Completed |
Unit Testing 1 |
5 days |
2 March |
7 March |
Ergin&Emin |
%0 Completed |
Unit Testing 2 |
5 days |
18 March |
23 March |
Mehtap&Ilgýn |
%0 Completed |
Unit Testing 3 |
5 days |
3 April |
8 April |
Eren |
%0 Completed |
Integration Testing |
15 days |
10 April |
25 April |
All Members |
%0 Completed |
System Validation |
10 days |
15 April |
25 April |
All Members |
%0 Completed |
Preparation of User Manuals |
10 days |
1 May |
11 May |
All Members |
%0 Completed |
First Semester Demo Executable |
Final Package for Linux |
Final Package for Windows |
Developer's Manual |
User Manual |
Installation Instructions
|